ETAIN HEALTH / PROJECT SNAPSHOT
Temporary capacity for a new Trenton operation.
Etain Health needed a full turnkey cultivation facility to begin year-round production in Trenton, New Jersey, while its larger buildout moved forward. The facility had to support propagation, flowering and dry and cure functions, along with secure operational space for staff, utilities and processing.
Built around the workflow.
Box4Grow designed a modular system for rapid deployment on the temporary site. The rooms connect through a single access hallway, making it easier to move between spaces while preserving a closed, sealed cultivation environment.
- 1 propagation room and 1 mom/clone room
- 4 flower rooms and 1 dry and cure room
- Dedicated staff, processing and utility space
- Secure layout designed for controlled access

Delivered in less than eight weeks.
The system was assembled in Box4Grow’s New Hampton, New York warehouse, then installed and finished on site in Trenton. Insulated R-21 modular panels and central automation created a controlled environment designed for continuous operation.

Need a temporary or permanent cultivation facility? Contact Box4Grow to discuss your site, license status and production target.